青柠影院电视剧在线看_无码专区人妻系列日韩精品_国产亚洲精品久久久久苍井松_√天堂8资源中文在线_美女裸身裸乳视频网站_怡红院av一区二区三区_我们高清中国免费观看_最新国产视频_最近中文字幕在线中文高清版

 

Chengbei High-tech Park Advanced Dedicated Chip System Packaging and Module Manufacturing Base Plant Construction Project

Construction time: November 15, 2019 - July 31, 2021

Building area: 78,000㎡,Clean area: 22,000㎡

Cleanliness level: Class 100 - 1,000

Scope of contracting: EPC construction general contracting

Project process equipment: Mask aligner

 
 

Project highlights:the design, procurement, construction, management, trial operation, acceptance and warranty services for construction engineering, structural engineering, decoration engineering, water supply and drainage engineering, elevator engineering, space management engineering, cleanroom engineering, ventilation and air conditioning engineering, power engineering, power supply and lightning protection engineering, anti-static engineering, electric power engineering, lighting engineering, communication engineering, automatic control engineering, weak power engineering, professional system engineering, external works, secondary distribution system engineering of production process equipment (excluding machine handling, installation and equipment internal connection), and three supplies and one leveling within the boundary line of the preliminary design land.

 

 
Aerial view  
  • Back to Top